{"id":2214,"date":"2021-11-19T08:25:00","date_gmt":"2021-11-19T13:25:00","guid":{"rendered":"https:\/\/scaffoldingsolutions.com\/?p=2214"},"modified":"2022-06-01T17:23:05","modified_gmt":"2022-06-01T21:23:05","slug":"scaffolding-solutions-bring-safety-general-assembly-building","status":"publish","type":"post","link":"https:\/\/www.scaffoldingsolutions.com\/articles\/scaffolding-solutions-bring-safety-general-assembly-building\/","title":{"rendered":"15 Story Building Remodel With Dual Car Lift &#038; 7,100 lb. Capacity"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\"alignright wp-image-2217\" src=\"https:\/\/scaffoldingsolutions.com\/wp-content\/uploads\/2021\/02\/Scaffolding-Hoist-in-Richmond-Virginia.jpg\" alt=\"Scaffolding Hoist in Richmond, Virginia\" width=\"400\" height=\"533\" srcset=\"https:\/\/www.scaffoldingsolutions.com\/wp-content\/uploads\/2021\/02\/Scaffolding-Hoist-in-Richmond-Virginia.jpg 600w, https:\/\/www.scaffoldingsolutions.com\/wp-content\/uploads\/2021\/02\/Scaffolding-Hoist-in-Richmond-Virginia-225x300.jpg 225w\" sizes=\"auto, (max-width: 400px) 100vw, 400px\" \/><\/p>\n<p><span style=\"font-weight: 400;\">The Virginia General Assembly Building in downtown Richmond was long overdue for a significant remodel. The structure was scheduled for partial demolition and rebuilding by <\/span><a href=\"https:\/\/www.gilbaneco.com\/\"><span style=\"font-weight: 400;\">Gilbane Building Company<\/span><\/a><span style=\"font-weight: 400;\">.&nbsp;<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The improved 15-story building would blend old and new, preserving the original 1912 limestone fa\u00e7ade while modernizing the rooms and public spaces.&nbsp;<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Considering that the new structure had no internal elevator, Gilbane nee<\/span><span style=\"font-weight: 400;\">ded scaffolding for a building remodel that would allow them<\/span><span style=\"font-weight: 400;\"> to get workers and materials efficiently and safely from floor to floor.&nbsp;<\/span><\/p>\n<p><span style=\"font-weight: 400;\">They contacted the local experts, Scaffolding Solutions, who provided a versatile solution with the following benefits and superior safety features:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">7,100lbs of hoist capacity<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Dual car lift<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Extremely quick turnaround of revised blueprints and hoist reconfiguration due to an unexpected change of scope<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Safe movement of heavy equipment by the crew<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Job completed on time and on budget<\/span><\/li>\n<\/ul>\n<h2>The Challenge<\/h2>\n<p><span style=\"font-weight: 400;\">Safety was one of Gilbane Building Company\u2019s major concerns. The scaffolding had to offer a safe environment for everyone on the project. This was of critical importance as the construction progressed upwards.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Without an internal elevator, it was up to the buck hoist system to lift all the workers, tools, and materials to each floor. Work on the Virginia General Assembly Building could progress only as fast as the hoist could feed the job. To keep the project on track, reliability and lift capacity were essential.&nbsp;<\/span><\/p>\n<p><span style=\"font-weight: 400;\">As the project got underway, the team discovered an unexpected 15-inch variance between the base pad and the actual building fa\u00e7ade.<\/span><\/p>\n<h2>The Solution<\/h2>\n<p><span style=\"font-weight: 400;\">After discovering the measurements didn\u2019t match the existing building fa\u00e7ade, Scaffolding Solutions quickly got to work revising their plans. They realized they could reconfigure the hoist and produce a new set of drawings within a single day\u2014which was an impressive turnaround time.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">For the project, Scaffolding Solutions chose a Scando 650 Dual Hoist system. The buck hoist operated like an elevator on the side of the building and was capable of lifting 7,100 pounds. It consisted of two fully enclosed cars operating independently on either side of a central mast.&nbsp;<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Using dual cars, rather than the more common single-car option, Gilbane could easily maintain productivity on the job site. Scaffolding Solutions selected a Scando system because it integrates safety into the design.<\/span><\/p>\n<p style=\"text-align: center; background: #f8f8f8; padding: 40px; border-radius: 3px; margin: 20px 0;\"><strong><em>\u201cOur number one goal every single day is safety,\u201d says Danny Dunbar, Project Manager for Scaffolding Solutions. \u201cScando has far more safety features compared to other systems.\u201d<\/em><\/strong><\/p>\n<p><span style=\"font-weight: 400;\">The Scando hoist used for the Virginia General Assembly Building construction site included:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Magnetic and electronic interlocks to prevent doors from opening while the hoist was in motion<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Pre-programmed landing locations for each floor<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Loading doors that automatically locked when the hoist left the ground<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Doors that could only open from the inside while the hoist was off the ground<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">As an added benefit, Scaffolding Solutions is <\/span><a href=\"https:\/\/scaffoldingsolutions.com\/virginia-scaffolding\/\"><span style=\"font-weight: 400;\">headquartered in Richmond, VA.<\/span><\/a><span style=\"font-weight: 400;\"> The proximity of the main office to the job site meant that the hoist technicians could be on-site quickly if equipment needed servicing.<\/span><\/p>\n<h2>The Result<\/h2>\n<p><span style=\"font-weight: 400;\">Gilbane was delighted with everything Scaffolding Solutions provided. The equipment worked smoothly from day one, and there were no safety concerns. Selecting the Scando 650 Dual Hoist was an incredibly productive choice.&nbsp;<\/span><\/p>\n<p style=\"text-align: center; background: #f8f8f8; padding: 40px; border-radius: 3px; margin: 20px 0;\"><b><i>\u201cHaving a dedicated material car while still being able to move personnel floor to floor was a huge benefit,\u201d says Dunbar.<\/i><\/b><\/p>\n<p><span style=\"font-weight: 400;\">Collaborating to solve the project\u2019s challenges led to an excellent professional relationship between Gilbane and Scaffolding Solutions. Based on the strength of their partnership, Gilbane has since offered to team up with Scaffolding Solutions on another long-term project.<\/span><\/p>\n<h2>Scaffolding Solutions Is Committed to Safety<\/h2>\n<p>At Scaffolding Solutions, we\u2019re dedicated to delivering scaffolding and <a href=\"https:\/\/scaffoldingsolutions.com\/services\/construction-hoists\/\">buck hoist rentals<\/a> that are dependable, cost-effective, and above all, safe. We support jobs from pre-planning to execution, with professionalism and integrity as the foundation of everything we do.<\/p>\n<p>Your project deserves the best in the industry. Let\u2019s work together to solve your challenges.<\/p>\n<p><a class=\"button blue-bg\" href=\"https:\/\/scaffoldingsolutions.com\/services\/\">Learn More About Our Scaffolding Services<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Virginia General Assembly Building in downtown Richmond was long overdue for a significant remodel. The structure was scheduled for partial demolition and rebuilding by Gilbane Building Company.&nbsp; The improved 15-story building would blend old and new, preserving the original 1912 limestone fa\u00e7ade while modernizing the rooms and public spaces.&nbsp; Considering that the new structure [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":2217,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_relevanssi_hide_post":"","_relevanssi_hide_content":"","_relevanssi_pin_for_all":"","_relevanssi_pin_keywords":"","_relevanssi_unpin_keywords":"","_relevanssi_related_keywords":"","_relevanssi_related_include_ids":"","_relevanssi_related_exclude_ids":"","_relevanssi_related_no_append":"","_relevanssi_related_not_related":"","_relevanssi_related_posts":"2619,2504,2590,2366,89,2400","_relevanssi_noindex_reason":"","footnotes":""},"categories":[6],"tags":[],"class_list":["post-2214","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-case-studies"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.scaffoldingsolutions.com\/wp-json\/wp\/v2\/posts\/2214","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.scaffoldingsolutions.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.scaffoldingsolutions.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.scaffoldingsolutions.com\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.scaffoldingsolutions.com\/wp-json\/wp\/v2\/comments?post=2214"}],"version-history":[{"count":0,"href":"https:\/\/www.scaffoldingsolutions.com\/wp-json\/wp\/v2\/posts\/2214\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.scaffoldingsolutions.com\/wp-json\/wp\/v2\/media\/2217"}],"wp:attachment":[{"href":"https:\/\/www.scaffoldingsolutions.com\/wp-json\/wp\/v2\/media?parent=2214"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.scaffoldingsolutions.com\/wp-json\/wp\/v2\/categories?post=2214"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.scaffoldingsolutions.com\/wp-json\/wp\/v2\/tags?post=2214"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}